"Another fire at PA nuclear plant and a scram..." 10/28/25

Susquehanna - Full Reactor SCRAM & Fire in Switchyard
U.S. Nuclear Regulatory Commission
Operations Center
 
EVENT REPORTS FOR
10/28/2025 - 10/29/2025
 
EVENT NUMBERS
58012
Power Reactor
Event Number: 58012

Facility: Susquehanna
Region: 1     State: PA
Unit: [2] [] []
RX Type: [1] GE-4,[2] GE-4
NRC Notified By: Kenneth Hulbert
HQ OPS Officer: Kerby Scales Notification Date: 10/28/2025
Notification Time: 22:57 [ET]
Event Date: 10/28/2025
Event Time: 19:04 [EDT]
Last Update Date: 10/28/2025 

Emergency Class: Non Emergency
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS Actuation - Critical 50.72(b)(2)(xi) - Offsite Notification
Person (Organization):
Young, Matt (R1DO)
Grant, Jeffery (IRMOC)
McKenna, Philip (NRR EO)
 

Power Reactor Unit Info

Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
2 A/R Y 100   0  

Event Text

RPS ACTUATION AND OFFSITE NOTIFICATION

The following is a summary of information provided by the licensee via phone and email:

At 1904 EDT on 10/28/2025, there was a full reactor scram at Susquehanna Unit 2 from 100 percent power.
 
All systems operated as expected, and the plant is stable in mode 3 with decay heat removal via the main condenser.
 
The cause of the scram is under investigation. Unit 1 was not affected.

Concurrent with the Unit 2 scram, the control room received a report of a fire outside of the protected area near
 
the Susquehanna Steam Electric Station 500-kilovolt switchyard. The local fire department responded to the site
 
with lights and sirens active which caused heightened public concern on social media. An event of potential
 
public interest notification was made to the Pennsylvania Emergency Management Agency (PEMA).
 
It was determined no fire existed, no actions were taken by the offsite fire company, and no personnel
 
were injured during the event.

Whether the reported fire and the reactor scram are related, is being investigated.

This event is being reported under 10 CFR 50.72(b)(2)(iv)(B) and 10 CFR 50.72(b)(2)(xi) for the unplanned
 
actuation of the reactor protection system while the reactor is critical and for the offsite notification to PEMA.

The NRC Resident Inspector has been notified.