Incident Chronology at Peach Bottom Atomic Power Plant: 1974- 2012

Philadelphia Electric's (PECO) applied for a license to operate the
Peach Bottom Atomic Power Station in late-July, 1960. The application
was approved by the Atomic Energy Commission. Peach Bottom was a 40
megawatt, High Temperature Graphite Moderated reactor that operated
from 1966-1974.

Peach Bottom 2 & 3 , are 1,065 megawatt Boiling Water Reactor designed
by General Electric and engineered by Bechtel. Both reactors began
operation in July, 1974, but had their licensees extended by the Nuclear
Regulatory Commission (NRC) and are expected to operate though 2034.
The Nuclear Regulatory Commission (NRC) and the Institute for
Nuclear Power Operations (INPO) have clearly demonstrated that
Philadelphia Electric's (PECO), renamed Exelon in 2000, performance has
historically been lackadaisical and sub-par. In order to put Peach Bottom's
operating history into perspective, it is necessary to review PECO's plant
legacy.