License for Exelon, NRG merger under federal consideration
The U.S. Nuclear Regulatory Commission (the Commission) is considering the issuance
of an order under Title 10 of the CODE OF FEDERAL REGULATIONS (10 CFR), Section 50.80
approving the indirect transfer of the Facility Operating License DPR-12 for Peach Bottom
Atomic Power Station (PBAPS), Unit 1, and Renewed Facility Operating Licenses, which are
numbered, DPR-44 and DPR-56, for PBAPS Units 2 and 3, including its associated independent
spent fuel storage installation, currently held by Exelon Generation Company, LLC (EGC), as
owner and licensed operator of PBAPS. EGC is a wholly-owned subsidiary of Exelon
Corporation (Exelon). PBAPS Unit 1 is permanently shut down.
Open attached pdf to read the entire document:
Type:
- Log in to post comments