Peach Bottom to unload spent fuel

From the York Daily Record:

Soon, workers at the nuclear-powered plant will unload more than 60 spent fuel assemblies from a 18-foot cask into the grid-like racks of the power station's spent fuel storage pool, said Neil Sheehan, a spokesman for the U.S. Nuclear Regulatory Commission.

The assemblies are bundled fuel rods that have been removed from the reactor and replaced with fresh alternates.

Last month, workers found a small amount of the inert gas had leaked from the system on the cask, which is designed to prevent helium inside the 115-ton container from escaping.

Read more

Type: