News

August 1, 2013

Cindy Bladey, Chief
Rules, Announcements and Directives Branch, Office of Administration U.S. Nuclear Regulatory Commission
Washington, D.C. 20555-0001

 

SUBJECT: Comments on Draft Consequence Study, NRC-2013-013

 

Dear Ms. Bladey:

In response to NRC’s notice at 78 Fed. Reg. 39,781 (July 2, 2013), I am enclosing the Declaration of 1 August 2013 by Gordon R. Thompson: Comments on the US Nuclear Regulatory Commission’s Draft Consequence Study of a Beyond-Design-Basis Earthquake Affecting the Spent Fuel Pool for a US Mark I Boiling Water Reactor. Dr. Thompson’s comments are sponsored by the following environmental organizations: Beyond Nuclear, Blue Ridge Environmental Defense League, Center for a Sustainable Coast, Citizens Allied for Safe Energy, Don’t Waste Michigan, Ecology Party of Florida, Friends of the Coast, Friends of the Earth, Georgia Women’s Action for New Directions, Green States Solutions, Hudson River Sloop Clearwater, Missouri Coalition for the Environment, NC WARN, Nevada Nuclear Waste Task Force, New England Coalition, No Nukes Pennsylvania, Nuclear Energy Information Service, Nuclear Information and Resource Service, Nuclear Watch South, Physicians for Social Responsibility, Public Citizen, Riverkeeper, SEED Coalition, San Luis Obispo Mothers for Peace, Sierra Club Nuclear Free Campaign, and Southern Alliance for Clean Energy.

Download PDF

Type: 

Online Reference Portal for Nuclear Regulatory Commission Review of Fukushima Near Term Task Force Related Documents

Download ML13206A427

Type: 

GPU NUCLEAR, lNC., THREE MILE ISLAND STATION, UNIT 2 - NRC I NSPECTION REPORT 05000320/201 300

Download ML13210A165

Type: 

 

Contact: Scott Portzline - Three Mile Island Alert 717-232-8863

Nuclear Watchdog Group Says the Results of a Hostile Action Drill at Three Mile Island are Grievously Misleading

A key element was missed during the hostile action drill at Three Mile Island (TMI). Specifically, emergency responders could be prevented from carrying out their responsibilities if the bridges at TMI are not under the control of the licensee. The control of approach routes was previously an NRC goal during the rule making process in which TMI Alert participated.

Type: 

THREE MILE ISLAND STATION, UNIT 1 – NRC INTEGRATED INSPECTION REPORT 5000289/2013003

Download ML13211A022

Type: 

THREE MILE ISLAND NUCLEAR STATION, UNIT 1:  NRC TEMPORARY INSTRUCTION 2201/004, “INSPECTION OF IMPLEMENTATION OF INTERIM CYBER SECURITY MILESTONES 1-7,” REPORT 05000289/2013404

Download ML13200A307

Type: 

Summary of June 17, 2013, Meeting with Exelon to Discuss Recent Once-Through Steam Generator Tube-to-Tube Wear at Three Mile Island, Unit 1 (TAC No. MF1787)

Download ML13179A093

Type: 

BRAIDWOOD STATION, UNITS 1 AND 2; BYRON STATION, UNIT NOS. 1 AND 2; CLINTON POWER STATION, UNIT NO.1; DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3; LASALLE COUNTY STATION, UNITS 1 AND 2; LIMERICK GENERATING STATION, UNITS 1 AND 2; OYSTER CREEK NUCLEAR GENERATING STATION; PEACH BOTTOM ATOMIC POWER STATION, UNITS 2, AND 3; QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2; AND THREE MILE ISLAND NUCLEAR STATION, UNIT 1 ­ SAFETY ASSESSMENT OF COMMUNICATIONS: (TAC NOS. ME9943, ME9944, ME9945, ME9946, ME9949, ME9953, ME9954, ME9963, ME9964, ME9965, ME9966, ME9972, ME9974, ME9975, ME9982, ME9983, AND ME9989)

Download ML13114A067

Type: 

On June 20, 2013, the commissioners of the Susquehanna River Basin Commission (SRBC) authorized staff to release proposed updates to the Comprehensive Plan for the Water Resources of the Susquehanna River Basin for public review and comment http://www.srbc.net/planning/compplanfiles.asp. The draft updated Plan will also be part of a SRBC public hearing to be held on August 15, 2013, in Harrisburg, Pennsylvania. Written comments can be submitted through August 26, 2013. Details on the hearing are available at http://www.srbc.net/pubinfo/publicparticipation.htm.

 

Susquehanna River Basin Commission
1721 North Front Street
Harrisburg, PA  17102
717/238-0423

Type: 

REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR PEACH BOTTOM ATOMIC POWER STATION, UNIT NOS. 2 AND 3 (TAC NOS. MF1970 AND MF1971)

Download ML13162A619

Type: 

Pages